Northwestern Alberta sour gas plant odour abatement
system screening-feasibility study and AACE Class IV
cost estimate
- Permitting, design and procurement and construction
support for facilities and pipelines for central Alberta
gas well tie-ins on Crown and First Nations lands
- Technical-regulatory feasibility study and AACE
Class IV cost estimate for a proposed gas pipeline
across the Belly River in southern Alberta
- Permitting and facilities design and procurement and
construction support for tripling the throughput
capacity of an existing central Alberta compressor
station. Included registration of station piping and
pressure equipment with ABSA.
- Permitting and design support for modifying and
upgrading conventional shallow gas and CBM production
facilities across central Alberta.
- Retroactive piping and pressure equipment
registration with ABSA for several existing central
Alberta compressor stations
- Review and P.Eng. stamping of Piping and
Instrumentation Diagrams (“P&IDs”) for numerous
conventional shallow gas and CBM production facilities
tie-ins across central Alberta
- Conceptual-preliminary engineering study and AACE
Class IV cost estimate for upgrading a vapour recovery
and sales compressor system on a central Alberta crude
oil terminal to eliminate operational problems due to
corrosion
- Preliminary engineering study to size relief hatches
and vacuum breakers on large crude oil tanks to enable
expansion of crude receipt and with drawl rates for a
large central Alberta crude oil truck and pipeline
terminal
- Conceptual-preliminary engineering study and AACE
Class IV cost estimate for upgrading the odour abatement
system on two (2) large dilbit storage tanks to
accommodate increased production rate of a
poorly-weathered product at a large central Alberta
heavy crude oil storage and blending terminal
|
 |
|