Cost/Schedule Control
 
Employment of a proven, widely-used, commercially-available accounting package in conjunction with commercially-available database and time tracking software enables CEL Projects to readily call up accurate, meaningful project reports. Flexibility within the accounting package and interconnections between the database and other software enables CEL Projects to build the following features into these reports.
  • Accurate cost and schedule forecasts incorporating management of change (“MOC”) data including approved, pending and anticipated changes
  • Client-supplied and/or other cost account codes
  • Cost estimate and report layouts that are our standard, client-preferred or work breakdown structure (“WBS”) driven
  • Responsive reporting of engineering, subcontractor, material and packaged equipment and fabrication progress and costs
  • Capability to link directly with construction management and inspection systems to provide current and accurate installation costs